
Turnkey EPC Contract100% Vetted DeliveryUCI (Union Cycliste Internationale) Banked Curve Norms
Cycling Track & Velodrome Construction
Banked velodromes, pump tracks, and polyurethane commuter loops.
Starting Budget
₹24.0 Lakhs
Single-window turnkey
Execution SLA
35–55 days
Laser-graded delivery
Warranty Protection
1–3 Years
Workmanship & Delamination
Regulatory Standards
UCI Certified
Tournament Pace & Safety
Engineering Blueprint
BOM VerifiedTechnical Dimensions & Standards
Track Geometry
250m / 333m Velodrome or Loops
Engineered banking up to 45 degrees or 3m–5m community paths
Sub-Base Structure
120mm Heavy-Duty Asphalt Macadam
High-compaction bituminous asphalt over graded aggregate base
Surface Layer
Polyurethane Resin with Micro-Texture
Non-skid quartz-infused polymer exceeding international skid norms
Drainage System
Continuous Polymer Concrete Channel
High-capacity slit drains to prevent standing water on curves
Night Illumination
8× 400W Anti-Glare LED Fixtures
Asymmetric lighting angled along riding vector for maximum safety
Safety Railings
Impact-Absorbing Steel Barriers
Smooth rounded balustrades with continuous protective kickboard
Sanctioning Body Compliance
UCI (Union Cycliste Internationale) Banked Curve NormsBritish Standard EN 14877IRC Geometric Guidelines for Cycle Tracks
Execution SLA
35–55 daysTurnkey Construction Lifecycle
Phase 1 · Days 1–10Step 1 of 6
Geotechnical Survey & Earth Banking
Laser grading, subgrade stabilization, and precision banking curve formation.
Cost Breakdown
Standard Bill of Quantities (BOQ) Heads
Earthwork & Subgrade
- Geotechnical grading & banking formation
- Subgrade lime/cement stabilization
- 150mm Wet Mix Macadam (WMM) base
- Tack coat bituminous emulsion
Pavement & Surfacing
- 120mm Dense Bituminous Macadam (DBM)
- Polyurethane elastomer primer & basecoat
- Quartz-infused anti-skid micro-texture
- UV-resistant polyurethane pigmented topcoat
Drainage & Safety
- Polymer concrete slit drainage channels
- Heavy-duty cast-iron inspection grates
- Tubular galvanized safety crash barriers
- Continuous wooden/composite safety kickboard
Lighting & Demarcations
- 8× 400W asymmetric LED sports floodlights
- Weatherproof control panel with timer controls
- Thermoplastic lane and kilometer split markings
Contract Deliverables
Scope of Work & Guaranteed Inclusions
Core EPC Scope
- Geotechnical laser grading & subgrade stabilization
- Heavy-duty asphalt compaction layer 120mm
- Anti-skid polyurethane polymer surfacing with micro-texture
- UCI-compliant banked curve geometry & safety runoffs
- Shock-absorbing perimeter railings & crash barriers
- Anti-glare LED illumination 8×400W for night riding
Turnkey Package Inclusions
- Perimeter French drainage network
- Distance split & lane markers
- 3-year structural asphalt warranty
- Annual surface integrity check
Financial Feasibility Model
Calculate Your Facility ROI & Cash Flow
Access Fieldr's audited pro-forma model calibrated for Indian metros. Simulate peak hourly rates, occupancy ramp-up, monthly OPEX, and break-even timelines.
Revenue
₹2.5L – ₹5.0L (Community / Ticketed)
Payback
24 – 36 Months
Projected ROI
32% – 48% Annualized
Verified Contractor Network
Nationwide NetworkApproved Turnkey Builders for this Track
60+ Vetted Turnkey Sports Infrastructure Contractors Available
Post an RFP to receive up to 5 competitive, itemized tenders from certified builders in your city within 48 hours.
Request Contractor BidsOperator Experience
Client Reviews & Performance Ratings
No client reviews submitted for this specific track yet. Build your sports facility and be the first to share verified operator feedback!
Technical Knowledge Base
Frequently Asked Questions
What types of cycling tracks can you build?
We engineer 250m/333m banked velodromes, closed asphalt criterium circuits, modular pump tracks, and green community cycling loops.
What is the surface grip in wet conditions?
We use a specialized quartz-aggregate infused polyurethane topcoat that exceeds international skid-resistance standards even during heavy rainfall.
